Schneider Electric EM4000 User Manual

Page of 44
930-134-01-A.00 
PowerLogic
TM
 Series EM4000
11/2013
Installation Guide
©2013 Schneider Electric All Rights Reserved
7
3. Determine the number and types of meters or monitors required (single-phase, 
network, or three-phase).
4. Determine the model number and correct sense voltage based on the voltage 
label on the top right side of the unit.
Access to Power and Lighting
The installation site must be supplied with access to the main electrical panel and 
any sub-panels. Portable or permanent lighting must be available to provide the 
installers with a clear view of the equipment and of the installation environment. 
Each installation may vary depending on physical site restrictions.
Installation Procedures
This section provides information about activities that must be performed to install 
the PowerLogic EM4033 and EM4080 meters in a single-phase 2-wire, 
single-phase 3-wire (network), or three-phase 4-wire application. The installation 
procedures must be performed in the following order:
a.
b.
Mounting the PowerLogic EM4000 meter 
Figure 3 shows the general mounting layout for metering 120V/208V wye services, 
and Figure 4 shows the general mounting layout for metering 347V/600V wye 
services. 
1. Remove the front cover from the meter by removing the four screws with a #2 
Phillips screwdriver. Retain the cover and screws for later re-installation.
2. Mount the PowerLogic meter on the wall and secure it by inserting a screw in 
each mounting keyhole and tightening the screws. 
3. Mount the shorting block enclosure on the wall as shown in Figures 3 and 4. 
Secure it by inserting a screw in each mounting keyhole and tightening the 
screws.
4. Install the conduit for voltage and current connections.
In Figure 3, the meter is powered and takes its sense voltage directly from a 
breaker within the panel.