Schneider Electric EM4000 User Manual
930-134-01-A.00
PowerLogic
TM
Series EM4000
11/2013
Installation Guide
©2013 Schneider Electric All Rights Reserved
7
3. Determine the number and types of meters or monitors required (single-phase,
network, or three-phase).
4. Determine the model number and correct sense voltage based on the voltage
label on the top right side of the unit.
Access to Power and Lighting
The installation site must be supplied with access to the main electrical panel and
any sub-panels. Portable or permanent lighting must be available to provide the
installers with a clear view of the equipment and of the installation environment.
Each installation may vary depending on physical site restrictions.
any sub-panels. Portable or permanent lighting must be available to provide the
installers with a clear view of the equipment and of the installation environment.
Each installation may vary depending on physical site restrictions.
Installation Procedures
This section provides information about activities that must be performed to install
the PowerLogic EM4033 and EM4080 meters in a single-phase 2-wire,
single-phase 3-wire (network), or three-phase 4-wire application. The installation
procedures must be performed in the following order:
the PowerLogic EM4033 and EM4080 meters in a single-phase 2-wire,
single-phase 3-wire (network), or three-phase 4-wire application. The installation
procedures must be performed in the following order:
1. “Mounting the PowerLogic EM4000 meter” on page 7
2. “Installing Potential Transformers for Three-Phase Service Greater Than 277V”
2. “Installing Potential Transformers for Three-Phase Service Greater Than 277V”
a.
b.
6. “Manually Testing Communications” on page 26
7. “Connecting Pulse Inputs” on page 26
8. “Recording the Meter Map” on page 28
7. “Connecting Pulse Inputs” on page 26
8. “Recording the Meter Map” on page 28
Mounting the PowerLogic EM4000 meter
Figure 3 shows the general mounting layout for metering 120V/208V wye services,
and Figure 4 shows the general mounting layout for metering 347V/600V wye
services.
and Figure 4 shows the general mounting layout for metering 347V/600V wye
services.
1. Remove the front cover from the meter by removing the four screws with a #2
Phillips screwdriver. Retain the cover and screws for later re-installation.
2. Mount the PowerLogic meter on the wall and secure it by inserting a screw in
each mounting keyhole and tightening the screws.
Secure it by inserting a screw in each mounting keyhole and tightening the
screws.
screws.
4. Install the conduit for voltage and current connections.
In Figure 3, the meter is powered and takes its sense voltage directly from a
breaker within the panel.
breaker within the panel.