Schneider Electric EM4000 User Manual

Page of 44
PowerLogic
TM
 Series EM4000
 930-134-01-A.00
Installation Guide
11/2013
6
©2013 Schneider Electric All Rights Reserved
Installation 
This section contains the following installation topics:
Pre-Installation
The pre-installation checklist and site planning must be performed before installing 
the equipment at the site. 
Receiving
The equipment required for each PowerLogic EM4000 meter installation includes:
• high-density meter (PowerLogic EM4033 or PowerLogic EM4080)
• For the PowerLogic EM4033 and PowerLogic EM4080, one 12-ft (4-m) AMP 
cable with one 50-pin connector supplied with each unit
• CD and meter configuration software, this installation manual and an installation 
record form
When you receive your order, verify that the items listed above are included with 
the shipment, and visually inspect them for damage. If any parts are missing or 
damaged, contact your Schneider Electric representative.
Pre-Installation Checklist
The installer must provide the following information, tools, and equipment before 
proceeding with the installation:
• certified current transformers for metering (not supplied)
• an appropriate 15-Amp maximum circuit breaker or a fused disconnect switch 
for the type of panel
• current/voltage meter to test the phasing of panels
RJ45 Ethernet patch cable
4-wire 14 AWG (1.63 mm
2
) cable for three-phase wye connected circuits, or 3-wire 14 
AWG (1.63 mm
2
) cable for a single-phase wye connected circuits
small flat-head screwdriver
#2 Phillips screwdriver
crimping tool
18 AWG butt splice connector
wire strippers
four 1-inch (25 mm) #8 mounting screws suitable for selected mounting surface
Site Planning
1. Determine the number of PowerLogic EM4000 series meters to be installed and 
ensure adequate space. For clearances, see Figure 3 on page 8. 
2. Determine the number of Ethernet drops required, and ensure they are installed 
before installing the PowerLogic EM4033 and EM4080 meters.