User ManualTable of ContentsTools Required1Backup the Switch Configuration2Inventory Feature Licenses2Power Down the Switch2Disconnect Ethernet and Serial Cables3Disconnect Fibre Channel Port Cables3Remove I/O Blades3Remove Power Supply Blades4Remove the Fan Blades4Remove CPU Blades4Remove Chassis from the Rack5Remove Brackets and Rails5Prepare the New Chassis5Install New Chassis in the Rack6Reinstall CPU Blades6Reinstall Fan Blades6Reinstall Power Supply Blades7Reinstall I/O Blades7Reconnect Ethernet and Serial Cables7Power Up the Switch7Observe Heartbeat LED8Verify the POST Results8Reinstall License Keys8Size: 847 KBPages: 8Language: EnglishOpen manual