User ManualTable of ContentsIntroduction1DS-16B Switch Features1Performance1Manageability1System Components1Fabric Operating System1GBICs1Departmental Switch Model 16B Front Panel1• Introduction1• System Components1Unpacking the Switch2Site Considerations2Cooling Requirements2Power Requirements2Installation Considerations2Standalone2Fiber Channel Cable Connections2Ethernet Connection2Verify Power-On Self Test (POST)2Model DS-16B with Two Power Supplies2Dual SC Fiber Optic Plug connector2• Unpacking the Switch2• Site Considerations2• Installation Considerations2Comparing Switch Management Access Methods3Managing Through Front Panel Buttons3Control Buttons3Activating Menu Display3DS-16B Switch Menus3Commands3Configuration Menu3Operation Menu3Switch Online3Status Menu3Test Menu3Front Panel Functionality3Menu Hierarchy3Temperature Sensor Approximate Locations on Motherboard3• Comparing Switch Management Access Methods3• Managing Through Front Panel Buttons3• DS-16B Switch Menus3Front Panel Diagnostics4Diagnostic Overview4Diagnostic Front Panel Displays4Isolating a System Fault4Removing Power4Status and Activity Indicators4Front Panel LED Port Indicators4Initialization Steps4Power-On Diagnostics (POST)4Diagnostic Tests4Test Menu4LED Indicators4Switch Setup to Run Cross Port Test4Front Panel Diagnostics4Status and Activity Indicators4Front Panel LED Port Indicators4Diagnostic Tests4Size: 2.42 MBPages: 98Language: EnglishOpen manual