Sterling SSL User Manual

Page of 66
 
29 
5-2 Operating 
Sequence 
1. Blowback 
sequence. 
2. Motor 
starts. 
3.  The flapper discharge valve seals under vacuum. 
4. Material 
conveys. 
5.  Hopper loader hopper fills. 
6.  Vacuum timer times out. 
7. Motor 
stops. 
8.  Blowback sequence begins, the flapper discharge valve opens 
under the weight, and material dumps. 
Steps 1 through 8 repeat automatically.
 
 
If the level switch remains open, the hopper loader remains idle until the material level in the 
bin drops and frees the discharge valve. Steps 1 through 8 in the loading sequence listed here 
resume automatically. 
 
 
5-3  Series One Plus Controls and Displays 
Series One Plus Controller Keys 
 UP Key 
Press the 
 UP key to increment up parameter values. 
 
 
 DOWN Key 
Press the 
 DOWN key to decrement down parameter values. 
 
 
CLEAR
 UP Key and DOWN Key—Press Together 
Press the 
CLEAR
 UP key and DOWN key together simultaneously while turning on power to 
reset to factory default values.