Intel SC5250-E User Manual

Page of 73
Intel® Entry Server Chassis SC5250-E 
System Cooling 
Revision 1.02 
 
Intel order number C32881-001 
 
17
4.7  Configuring CPU Duct Fan Assembly the Intel® 
APTWKTCOOLKIT for SE7505VB2 Intel® Server Board 
Fold the Air Duct that came with your Intel® Workstation Acoustic Kit as illustrated in figure 17.  
Make sure that the black marker lines are positioned towards the inside of the Air Duct. Begin 
with fold #1 and proceed through fold #7. Completed Air Duct should look like left and right 
views (see #8 and #9 in the following figure). 
 
1
2
3
4
5
6
7
TP00493
View from
left corner
View from
right corner
8
9
 
Figure 17. CPU Air Duct Folding 
Attach Air Duct to Rear System Fan. Locate the air direction arrow on the side of the Rear 
System Fan and position fan as shown in the following figure. (The label on the Rear System 
Fan should face towards the back of the system chassis and the finger guard should face 
towards the server board.) Ensure that the Fan Power Cable (letter B in the figure) exits at lower 
right-hand corner.