LG DT6101SAU Owner's Manual

Page of 12
 
 
 
 
EN 
5
 
INSTALLATION
 
Drilling the Support surface and Fitting the Hood 
• The Hood can be fitted directly on the 
lower surface of the Wall Units (650 mm 
min. above the Cooker Top) using the snap-
on Side Supports. 
•  Make an opening on the lower surface of 
the Wall Unit, as indicated. (fig.1) 
•  Choose the correct flange measure basing 
on the air outlet diameter and insert it to the 
upper air outlet opening. (fig.2) 
•  Screw the closing profile 20 onto the rear 
part of the hood, using the screws 12f  (2.9 
x 9.5) provided. (fig.3) 
•  Open the sliding suction panel. 
•  Remove the metal grease filters one by one 
after having disconnected the relative fas-
tening elements. 
•  Close the sliding suction panel again. 
•  Insert the Hood until the snap-on side sup-
ports click into place. (fig.4) 
•  Open the sliding suction panel. 
•  Lock in position by tightening the screws 
Vf from underneath the Hood. (fig.4)  
•  If necessary, adjust the whole filter holder 
unit and proceed as follows: 
  •  Loosen the four adjustment screws Vr 
and close the sliding panel again. (fig.5) 
  •  Move the entire filter holder unit until it 
is properly aligned with the wall unit. 
(fig.6) 
  •  Keeping the hood canopy still, open the 
sliding panel and lock the adjustment 
screws again. (fig.5) 
  •  The hood can now be fastened to the 
wall unit using the four screws 12a (3.5 
x 16) provided. (fig.7) 
•  Replace the metal grease filters. 
•  Close the sliding suction panel again. 
 
523
162
9
10a
10a
10b
V
12a