Schneider Electric E4800 User Manual

Page of 48
930-110-01-B.00 
PowerLogic
TM 
EM4800 Series
04/2011
Regulatory Compliance 
© 201
 Schneider Electric All Rights Reserved
35
REGULATORY COMPLIANCE
The PowerLogic EM4800 meter must be installed by a qualified electrician 
with knowledge of local installation regulations.  Initial installation of the unit, 
and any subsequent modification to the unit, must be inspected by the local 
electrical inspection authority.
The PowerLogic EM4800 meter complies with the standards listed in 
Table 4.
Table 4:  Regulatory Compliance
Equipment servicing and access
The information in this section must be considered as a mandatory 
requirement, and must be strictly adhered to when installing and operating 
PowerLogic EM4833, EM4880 and EM4805 meters.
Access to equipment
The equipment must be accessible to authorized personnel only. Equipment 
must be installed in areas where access can be restricted.
Servicing the equipment 
No preventive maintenance is required on any of the equipment. Visually 
inspect the equipment yearly and ensure it is free of dust or other particles. 
If necessary, wipe with a clean cloth. 
Component servicing
Individual components are not user-serviceable, and must be returned to 
Schneider Electric for repair. If an equipment fault occurs, do not attempt to 
repair the faulty component.
All maintenance activities should be performed by qualified personnel only. 
Do not perform any operating or maintenance procedures that are not 
described in the product documentation provided by Schneider Electric.
Discipline
Regulatory and industry standard
Standards
UL certified to IEC/EA/UL/CSA 61010-1 2
nd
 Edition 
CSA-C22.2 No. 61010-1-04
Emissions (EMC)
FCC Part 15 Class B, ICES-003 EN55022, IEC 6100-4-5
Surge power/telephone lines
ANSI/TIA968-A: 2002